What the filing says
A public-record reading of the proposed work.
Demolition of Building Up to Cellar Floor at front side and demolition of building up to 1st floor.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story elevator apartment building built in 2016, with 17 homes, on a 7,293 sq ft lot.
- Built
- 2016
- Last altered
- 2016
- Floors
- 8
- Residential units
- 17
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7X
- Lot area
- 7,293 sq ft
- Building area
- 20,472 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 13 notices on file; the most recent was issued Apr 28, 2025.
- Construction
Issued Apr 28, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT TIME OF INSPECTION,OBSERVED ABANDONMENT OF NEW CONSTRUCTION BUILDING.CONSTR UCTION PROJECT ALSO AT EXP1 UNFINISHED FACADE AND NUMEROUS OPEN WINDOW S AND ROOF.REMEDY:REPAIR AND/OR REPLACE
- Construction
Issued Nov 7, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED ABANDONMENT OF CONSTRUCTION NEW BUILDING PROJECT INCLUDING UNFINISH FACADE OPEN WINDOWS AND ROOF. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jun 26, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODDE COMPLIANT MANNER. OBSERVED UNFINISHED CONSTRUCTION OF NAN BUILDING, AND CLOSED JOB SITE
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01108695-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01108695-I1
- BBL
- 4098130011
- Postal code
- 11432 · 146 filings
- Review type
- Standard Plan Examination
- Existing stories
- 8
- Proposed stories
- 8
- Existing dwelling units
- 41
- Proposed dwelling units
- 41