What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1910, on a 2,300 sq ft lot.
- Built
- 1910
- Floors
- 3
- Residential units
- 2
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- M1-2/R6
- Lot area
- 2,300 sq ft
- Building area
- 2,872 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 9 notices on file; the most recent was issued Sep 28, 2006.
- Construction
Issued Sep 28, 2006
- Construction
Issued Jun 7, 2000 — WORK WITHOUT A PERMIT. WORK NOTED: GUT REHAB AT ALL FLOORS. (1) PARTIT ION WALL REMOVE AT 1ST FLOOR (2) PARTITIONS REMOVED AT 2ND FLOOR (3) ENTIRE FIRE STOP CEILING AND PLASTER AND STRIPPING REMOVED FROM 3RD FLOOR (4) FIRE STOP CEILING, PLASTER AND STRIPPING AND PARTITION WALL REMOVED AT 4TH STORY: STOP ALL WORK
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00444735-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00444735-I1
- BBL
- 3024430009
- Postal code
- 11249 · 2009 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 3
- Proposed dwelling units
- 3