NYC DOB record · X01333691-I1

916 Faile Street

916 Faile Street, Bronx, NY 10474

Alteration filing in Hunts Point, Bronx. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 3, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01333691-I1

916 Faile Street

Bronx, NY 10474

Alteration filing · status dated Oct 1, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
61
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01333691-I1 as a alteration filing at 916 Faile Street, Bronx, NY 10474. Its latest published status category is Recorded as completed, dated Oct 1, 2026. The filing records 61 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 1, 2026
Proposed scale
61 proposed dwelling units
The building, not the filingopen housing violations, what it sold for and every filing at BIN 2006367Applicant of recordSee the 594 filings that name Always Fast Services Corp
FiledDec 15, 2025
Current recordRecorded as completed
Proposed scale61 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1926, with 59 homes, on a 13,115 sq ft lot.

Built
1926
Floors
5
Residential units
59
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
13,115 sq ft
Building area
57,840 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 9 open notices on record for this building, out of 12 notices on file; the most recent was issued Jan 13, 2026.

  • Construction

    Issued Jan 13, 2026 — FTC W/COMMISSIONER'S ORDER-VIO#121125PI20202HZ CONTROL#348052 DATED 12/11/25 REQUIRING OWNER TO SUBMIT A CORRECTIVE ACTION PLAN BY 01/11/26.AS OF 01/13/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER VIO#121125PI20202HZ CONTROL#348052

  • Construction

    Issued Dec 11, 2025 — EMERGENCY WORK ORDER-OBSVD IMMED HAZ CONITIONS @ EXP4 BY CORNER OF EXP1(FAILE ST)SPALLED,BULGING/LOOSE STUCCO/PARGING @ ABOUT 5TH FLOOR LEVEL. COMPLY W/CODE IMMED RETAINA DOB REG GC TO INSTALL OVERHEAD PROTECTION/SIDEWALK SHED TO PROTECT PUBLIC/TEMANTS. PROVIDE APPROX 20 LINEAR FEET OF SH ALONG EXP4 BY THE EXP1/4 CORNER

  • Construction

    Issued Dec 11, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD PARAPET WALLS CAP STONE WALLS BRICKS&MORTAR IN DISREPAIR, ALSO STEP CRACKS&LEANING INWARD AT VARIOUS LOCATIONS.AN ANNUAL PARAPET WALL OBSERVATION REPORT IS REQ'D TO BE COMPLETED STARTING IN JAN 2024.SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR YEAR 2024&2025 T/BE REC'S BY DOB NO LATER THAN 12/29/2025

  • 6 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01333691-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01333691-I1
BBL
2027610083
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
59
Proposed dwelling units
61
Sidewalk shed