What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 24-story condominium built in 1982, with 20 homes, on a 2,542 sq ft lot.
- Built
- 1982
- Floors
- 24
- Residential units
- 20
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C1-9
- Lot area
- 2,542 sq ft
- Building area
- 27,526 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 12 open notices on record for this building, out of 62 notices on file; the most recent was issued Aug 1, 2024.
- Failure to correct swarmp conditions (facade)
Issued Aug 1, 2024 — FAILURE TO CORRECT SWARMP CONDITIONS
- Construction
Issued May 22, 2024 — PARTIAL VAC. ORDER TO ALL BALC.@SOUTH ELEV. AS PER UNSAFE FILING TR69137889C1 QEWI STATED BALC.RAILING SPACING ARE NOT IN CODE COMPLIANT. THESE CONDITIONS HAVE THEREFORE MADE ALL BALCONIES AT SOUTH ELEV. UNABLE TO BE OCCUPIED. REMEDY, VACATE ALL BALCONIES AT SOUTH ELEVATION
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
9 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01013344-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01013344-I1
- BBL
- 1013427502
- Postal code
- 10022 · 1352 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 20
- Proposed dwelling units
- 20








