NYC DOB record · M01028103-I1

926 2 Avenue

926 2 Avenue, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is on hold - pending withdrawal of site safety manager.

The filing is paused until an administrative step is completed. It has not been rejected. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01028103-I1

926 2 Avenue

Manhattan, NY 10022

Alteration filing · status dated Oct 12, 2026

Current record
Under review
Proposed scale
24 stories
Dwelling units
20
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01028103-I1 as a alteration filing at 926 2 Avenue, Manhattan, NY 10022. Its latest published status category is Under review, dated Oct 12, 2026. The filing records 24 proposed stories and 20 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Oct 12, 2026
Proposed scale
24 proposed stories and 20 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1039577Applicant of recordSee the 22 filings that name Sw Engineering Company
FiledAug 22, 2024
Current recordUnder review
Proposed scale24 stories
Recorded cost$141,000

What the filing says

A public-record reading of the proposed work.

Filing for limited exterior repairs. No change to egress, use, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 24-story condominium built in 1982, with 20 homes, on a 2,542 sq ft lot.

Built
1982
Floors
24
Residential units
20
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C1-9
Lot area
2,542 sq ft
Building area
27,526 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 15, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 12 open notices on record for this building, out of 62 notices on file; the most recent was issued Aug 1, 2024.

  • Failure to correct swarmp conditions (facade)

    Issued Aug 1, 2024 — FAILURE TO CORRECT SWARMP CONDITIONS

  • Construction

    Issued May 22, 2024 — PARTIAL VAC. ORDER TO ALL BALC.@SOUTH ELEV. AS PER UNSAFE FILING TR69137889C1 QEWI STATED BALC.RAILING SPACING ARE NOT IN CODE COMPLIANT. THESE CONDITIONS HAVE THEREFORE MADE ALL BALCONIES AT SOUTH ELEV. UNABLE TO BE OCCUPIED. REMEDY, VACATE ALL BALCONIES AT SOUTH ELEVATION

  • No report and / or late filing (facade)

    Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024

  • 9 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01028103-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “On Hold - Pending Withdrawal of Site Safety Manager.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 80,574 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01028103-I1
BBL
1013427502
Review type
Standard Plan Examination
Existing stories
24
Proposed stories
24
Existing dwelling units
20
Proposed dwelling units
20
General construction