What the filing says
A public-record reading of the proposed work.
Removal of sro units in cellar to address ecb violations: 39171989k & 39171986p. scope of work includes capping & removal of plumbing fixtures cellar. no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1937, with 27 homes, on a 7,500 sq ft lot.
- Built
- 1937
- Last altered
- 2001
- Floors
- 5
- Residential units
- 27
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-1
- Lot area
- 7,500 sq ft
- Building area
- 29,700 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 13 notices on file; the most recent was issued Nov 14, 2025.
- High pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
- High pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
- Construction
Issued Dec 24, 1992
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 8, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01354527-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01354527-I1
- BIN
- 2005452
- BBL
- 2027030014
- Postal code
- 10459 · 44 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 31
- Proposed dwelling units
- 31