What the filing says
A public-record reading of the proposed work.
Structural reinforcement for apt 11c, 21c, and 31c as per plans submitted herewith. no change to use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1927, with 120 homes, on a 42,750 sq ft lot.
- Built
- 1927
- Last altered
- 2016
- Floors
- 6
- Residential units
- 120
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 42,750 sq ft
- Building area
- 139,808 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 67 notices on file; the most recent was issued Oct 4, 2017.
- Construction
Issued Oct 4, 2017 — STRUCTURE RENDERED NON COMPLIANT NOTED DUE TO EXCAVATION WORK AT EXPOSURE (2) OF ADJACENT PROPERTY 123 LINDEN BLVD SECTION OF KNEE WALL SEPARATED AND COLLAPSE INTO EXCAVATED AREA
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00226379-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00226379-I1
- BBL
- 3050840097
- Postal code
- 11226 · 1757 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 120
- Proposed dwelling units
- 120