NYC DOB record · M01067057-I1

95 Madison Avenue

95 Madison Avenue, Manhattan, NY 10016

Alteration filing in Midtown South-Flatiron-Union Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01067057-I1

95 Madison Avenue

Manhattan, NY 10016

Alteration filing · status dated Sep 25, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
70
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01067057-I1 as a alteration filing at 95 Madison Avenue, Manhattan, NY 10016. Its latest published status category is Approved, dated Sep 25, 2026. The filing records 70 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 25, 2026
Proposed scale
70 proposed dwelling units
Applicant of recordSee the 1729 filings that name Paul Perdek, PROF. ENG. PLLC
FiledJun 17, 2024
Current recordApproved
Proposed scale70 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story office building built in 1912, on a 9,875 sq ft lot.

Built
1912
Floors
16
Residential units
0
Building type
Office building
Land use
Commercial and office
Zoning district
C5-2
Lot area
9,875 sq ft
Building area
146,161 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 113 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Sep 18, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION AT EXPOSURE 3 (EAST ELEVATION) IT WAS OBSERVED DETERIORATED MORTAR JOINTS & CRACKED TERRA COTTA. AT EXPOSURE 4 (SOUTH ELEVATION) CRACKED TERRA COTTA WAS OBSERVED

  • Construction

    Issued Apr 24, 2024 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. OBERSERVED AT EXP 1 STONE 3 FL, DAMAGED AT GABLE ROOF PAPER. EXPOSURE2 CRACK WATER TABLE & WINDOW LINTEL 3 FL. EXP 3 SPALLING ERODED MORTAR JOINTS. EXP4 CRACK WINDOW PANE @ SET BACK FACING EXP 3.ROOF BRKN SKYLIGHT CRACK, OPEN, JOINTS & SPALLING ALL EXPS REMEDY: REPAIR AND/OR REPLACE

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01067057-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01067057-I1
BIN
1016920
BBL
1008580058
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
70
Sidewalk shed