NYC DOB record · M01214037-I1

955 Lexington Avenue

955 Lexington Avenue, Manhattan, NY 10021

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 9, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01214037-I1

955 Lexington Avenue

Manhattan, NY 10021

Alteration filing · status dated Oct 6, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
27
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01214037-I1 as a alteration filing at 955 Lexington Avenue, Manhattan, NY 10021. Its latest published status category is Recorded as completed, dated Oct 6, 2026. The filing records 27 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 6, 2026
Proposed scale
27 proposed dwelling units
Applicant of recordSee the 152 filings that name Black Sheep Engineering Group
FiledApr 23, 2025
Current recordRecorded as completed
Proposed scale27 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story elevator apartment building built in 1924, with 27 homes, on a 6,353 sq ft lot.

Built
1924
Last altered
1988
Floors
12
Residential units
27
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R9X
Lot area
6,353 sq ft
Building area
54,719 sq ft
Historic district
Upper East Side Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 9, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01214037-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01214037-I1
BIN
1042508
BBL
1014040052
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
27
Proposed dwelling units
27
Scaffolding