What the filing says
A public-record reading of the proposed work.
Concrete / steel repairs at front fire escapes and balconies, all levels. concrete / steel repairs at parking garage roof slab and new wall and slab opening framing. stair repair at 3rd to 6th floor.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1963, with 60 homes, on a 21,325 sq ft lot.
- Built
- 1963
- Floors
- 6
- Residential units
- 60
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 21,325 sq ft
- Building area
- 56,352 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 22 notices on file; the most recent was issued Sep 19, 2026.
- Construction
Issued Sep 19, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT THE T IME OF INSPECTION,I OBSERVED AT EXP1,DETERIORATED BALCONY SLAB AT MULT IPLE LOCATIONS.AT EXP2,MISSING/DAMAGED MORTAR AND SPALLED COPING STONE OBSERVED.AT EXP3,STEP CRACK ON MORTAR JOINT AND CRACK ON WINDOW SILL A T FIRST FLOOR ON NORTHEAST CORNER.REMEDY:REPAIR AND/OR REPLACE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00911176-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00911176-I1
- BBL
- 3045940064
- Postal code
- 11212 · 2180 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 61
- Proposed dwelling units
- 61








