What the filing says
A public-record reading of the proposed work.
Direct replacement of (6) existing 15 ton indoor vertical package air conditioning units. no change to use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story office building built in 1925, on a 12,260 sq ft lot.
- Built
- 1925
- Last altered
- 1985
- Floors
- 9
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-5
- Lot area
- 12,260 sq ft
- Building area
- 108,764 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 193 notices on file; the most recent was issued Sep 5, 2018.
- Construction
Issued Sep 5, 2018 — STRUCTURE RENDERED NON-COMPLIANT AT THE TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO SIDEWALK CONCRETE AT THE CORNER OF EXPO #01 & #04 DUE TO DEP EXCAVATION FOR WASH BASIN REPAIR ATTACH TO SIDEWALK AND A SIDEWALK SHED POST ABOVE THAT LOCATION
- Elevator
Issued Oct 17, 2002
- Local law 10/81 -
Issued Jan 13, 1997
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01231522-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01231522-I1
- BBL
- 1006020036
- Postal code
- 10014 · 435 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








