NYC DOB record · B01109758-S3

961 52 Street

961 52 Street, Brooklyn, NY 11219

Alteration filing in Sunset Park (East)-Borough Park (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01109758-S3

961 52 Street

Brooklyn, NY 11219

Alteration filing · status dated Sep 21, 2026

Current record
Recorded as completed
Proposed scale
2 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01109758-S3 as a alteration filing at 961 52 Street, Brooklyn, NY 11219. Its latest published status category is Recorded as completed, dated Sep 21, 2026. The filing records 2 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 21, 2026
Proposed scale
2 proposed stories and 2 proposed dwelling units
The building, not the filingopen housing violations, apartment sizes, the owner of record and every filing at BIN 3138228Applicant of recordSee the 95 filings that name Sotir Associates
FiledJan 13, 2026
Current recordRecorded as completed
Proposed scale2 stories
Recorded cost$108,000

What the filing says

A public-record reading of the proposed work.

Replace pl fixtures in 2 family building. in conjunction with interior and exterior renovation with rear extention filed under b01109758-i1.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 1905, on a 2,003 sq ft lot.

Built
1905
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R6
Lot area
2,003 sq ft
Building area
3,480 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Mar 27, 2025.

  • Construction

    Issued Mar 27, 2025 — OWNER RESPONSIBILITY: STRUCTURE RENDERED NON COMPLAINT, REAR MASONRY WALL WAS REMOVED & REAR YARD FOUNDATION WRK INCLUDG EXCAVATION DONE WITHOUT PERMIT, CAUSING HAZARDS TO NEIGHBORS' YARDS & TO PUBLIC REMEDY: RETAIN NYS RDP TO DEVELOP PLANS, GET PERMITS & RESPOND TO AUDIT REQUESTS FOR THE UNPERMITTED WORK BY 04/04/25

  • Construction

    Issued Nov 1, 2024 — OWNR'S RESPONSBLTY;STRUCTURE RENDERED NON-COMPLIANT @ EXP#3 ENTIRE REAR MASONRY WALL REMOVD/REPLACD W PLYWOOD@GROUND LEVL,REAR EXCAVATION &CMU BLOCK WALL DEMO.NO PERMIT ON FILE CREATING HAZARDOUS CONDITIONS REMEDY: IMMED RETAIN NYS DESIGN PROF TO DEVELOP PLANS,SUBMIT MANDATD STABILITY RPT, SUBMIT PLANS TO CSE AUDIT REQUEST

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01109758-S3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01109758-S3
BBL
3056520048
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
2
Existing dwelling units
2
Proposed dwelling units
2