NYC DOB record · B00559417-I1

97 GAR George Street

97 GAR George Street, Brooklyn, NY 11206

Alteration filing in Bushwick (West), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00559417-I1

97 GAR George Street

Brooklyn, NY 11206

Alteration filing · status dated Sep 22, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00559417-I1 as a alteration filing at 97 GAR George Street, Brooklyn, NY 11206. Its latest published status category is Approved, dated Sep 22, 2021. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 22, 2021
Proposed scale
Not stated in this filing
The building, not the filingthe owner of record and every filing at BIN 3403583Applicant of recordSee the 158 filings that name Tectonic Engineering
FiledJul 29, 2021
Current recordApproved
Proposed scaleNot specified
Recorded cost$2,000

What the filing says

A public-record reading of the proposed work.

Temporary fence installation for emergency demolition of a garage under NYC HPD/DOB proceed.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 2017, with 8 homes, on a 2,500 sq ft lot.

Built
2017
Last altered
2015
Floors
4
Residential units
8
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
2,500 sq ft
Building area
5,949 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00559417-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00559417-I1
BBL
3031540036
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0
fence