NYC DOB record · M01361054-I1

97 Reade Street

97 Reade Street, Manhattan, NY 10013

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01361054-I1

97 Reade Street

Manhattan, NY 10013

Alteration filing · status dated Oct 9, 2026

Current record
Recorded as completed
Proposed scale
8 stories
Dwelling units
20
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01361054-I1 as a alteration filing at 97 Reade Street, Manhattan, NY 10013. Its latest published status category is Recorded as completed, dated Oct 9, 2026. The filing records 8 proposed stories and 20 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 9, 2026
Proposed scale
8 proposed stories and 20 proposed dwelling units
Applicant of recordSee the 3 filings that name Dxu LLC
FiledApr 15, 2026
Current recordRecorded as completed
Proposed scale8 stories
Recorded cost$49,000

What the filing says

A public-record reading of the proposed work.

Interior renovation work on the cellar and first floor as per plan filed. no change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 7-story condominium built in 1862, with 20 homes, on a 5,600 sq ft lot.

Built
1862
Floors
7
Residential units
20
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C6-3A
Lot area
5,600 sq ft
Building area
36,546 sq ft
Historic district
Tribeca South Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 55 notices on file; the most recent was issued Dec 1, 2023.

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • Elevator annual inspection /

    Issued Apr 5, 2019 — VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST

  • 7 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 12, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01361054-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01361054-I1
BIN
1001589
BBL
1001457504
Review type
Professional Certification
Existing stories
8
Proposed stories
8
Existing dwelling units
20
Proposed dwelling units
20
General construction