NYC DOB record · B00528874-I1

970 Kent Avenue

970 Kent Avenue, Brooklyn, NY 11205

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00528874-I1

970 Kent Avenue

Brooklyn, NY 11205

Alteration filing · status dated Mar 3, 2023

Current record
Recorded as completed
Proposed scale
9 stories
Dwelling units
104
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00528874-I1 as a alteration filing at 970 Kent Avenue, Brooklyn, NY 11205. Its latest published status category is Recorded as completed, dated Mar 3, 2023. The filing records 9 proposed stories and 104 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Mar 3, 2023
Proposed scale
9 proposed stories and 104 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3388495Applicant of recordSee the 1 filings that name Ryan Harvey, R.A.
FiledApr 27, 2022
Current recordRecorded as completed
Proposed scale9 stories
Recorded cost$123,480

What the filing says

A public-record reading of the proposed work.

Interior renovation in an existing apartment unit#306 on the 3rd floor of an existing residential building. architecture work only under this application. no change in use, occupancy, or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story condominium built in 1930, with 103 homes, on a 35,624 sq ft lot.

Built
1930
Last altered
2004
Floors
9
Residential units
103
Building type
Condominium
Land use
Elevator apartments
Zoning district
R7A
Lot area
35,624 sq ft
Building area
108,679 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 12 open notices on record for this building, out of 66 notices on file; the most recent was issued Sep 6, 2019.

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • 9 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00528874-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00528874-I1
BBL
3019257501
Review type
Standard Plan Examination
Existing stories
9
Proposed stories
9
Existing dwelling units
104
Proposed dwelling units
104
General construction