NYC DOB record · M01236088-S1

98 St Marks Place

98 St Marks Place, Manhattan, NY 10009

Alteration filing in East Village, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01236088-S1

98 St Marks Place

Manhattan, NY 10009

Alteration filing · status dated Nov 19, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
20
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01236088-S1 as a alteration filing at 98 St Marks Place, Manhattan, NY 10009. Its latest published status category is Approved, dated Nov 19, 2026. The filing records 20 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 19, 2026
Proposed scale
20 proposed dwelling units
The building, not the filingEvery filing at BIN 1005824, with the parcel and violation recordApplicant of recordSee the 14 filings that name Bodnar Architect PC
FiledJun 13, 2025
Current recordApproved
Proposed scale20 units
Recorded cost$19,000

What the filing says

A public-record reading of the proposed work.

Installation of new plumbing fixtures and relocation of existing plumbing fixtures. No change in occupancy, use, or means of egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1900, with 20 homes, on a 2,518 sq ft lot.

Built
1900
Last altered
1986
Floors
5
Residential units
20
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R8B
Lot area
2,518 sq ft
Building area
9,775 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01236088-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01236088-S1
BBL
1004350013
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
20
Proposed dwelling units
20