What the filing says
A public-record reading of the proposed work.
Modification to at&t site. install (4) ion-m23 sdars (rrh) and (1) equipment cabinet all with related equipment on roof. all in conformance with tppn 5/98. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story elevator apartment building built in 1936, with 78 homes, on a 8,800 sq ft lot.
- Built
- 1936
- Floors
- 10
- Residential units
- 78
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6B
- Lot area
- 8,800 sq ft
- Building area
- 57,460 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 60 notices on file; the most recent was issued Jun 30, 2025.
- Construction
Issued Jun 30, 2025 — PARTIAL VACATE ORDER: VACATE ENTIRE TERRACE 10FL @ SOUTH WESTERN CORN DUE TO UNSAFE CONDITIONS (DETERIORATED BRICKS & BRICKS POINTING AT TERRACE 10FL. CONDITIONS HAVE MADE THE ENTIRE TERRACE @ 10FL UNABLE TO BE OCCUPIED. REMEDY: OWNER TO VACATE THE ENTIRE TERRACE AT 10TH FLOOR AT SOUTH WESTERN CORNER
- Construction
Issued Mar 4, 2025 — PARTIAL VACATE ORDER DUE TO DETACHED STUCCO FROM THE WALL AND LOOSE MORTAR JOINTS AT MULTIPLE LOCATIONS AT REAR ELEVATION NORTH. REMEDY: VACATE REAR COURTYARD
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
5 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00291345-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00291345-I1
- BBL
- 3021000076
- Postal code
- 11217 · 2156 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 73
- Proposed dwelling units
- 73