NYC DOB record · B01206220-I1

99 Lafayette Avenue

99 Lafayette Avenue, Brooklyn, NY 11217

Alteration filing in Fort Greene, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 15, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01206220-I1

99 Lafayette Avenue

Brooklyn, NY 11217

Alteration filing · status dated Sep 11, 2026

Current record
Approved
Proposed scale
10 stories
Dwelling units
78
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01206220-I1 as a alteration filing at 99 Lafayette Avenue, Brooklyn, NY 11217. Its latest published status category is Approved, dated Sep 11, 2026. The filing records 10 proposed stories and 78 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 11, 2026
Proposed scale
10 proposed stories and 78 proposed dwelling units
The building, not the filingopen housing violations, what it sold for and every filing at BIN 3058922Applicant of recordSee the 22 filings that name Wrg Engineering, P.C.
FiledApr 16, 2026
Current recordApproved
Proposed scale10 stories
Recorded cost$564,800

What the filing says

A public-record reading of the proposed work.

Facade Restoration Project as per plans filed herewith. No change of use or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 10-story elevator apartment building built in 1936, with 78 homes, on a 8,800 sq ft lot.

Built
1936
Floors
10
Residential units
78
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6B
Lot area
8,800 sq ft
Building area
57,460 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 60 notices on file; the most recent was issued Jun 30, 2025.

  • Construction

    Issued Jun 30, 2025 — PARTIAL VACATE ORDER: VACATE ENTIRE TERRACE 10FL @ SOUTH WESTERN CORN DUE TO UNSAFE CONDITIONS (DETERIORATED BRICKS & BRICKS POINTING AT TERRACE 10FL. CONDITIONS HAVE MADE THE ENTIRE TERRACE @ 10FL UNABLE TO BE OCCUPIED. REMEDY: OWNER TO VACATE THE ENTIRE TERRACE AT 10TH FLOOR AT SOUTH WESTERN CORNER

  • Construction

    Issued Mar 4, 2025 — PARTIAL VACATE ORDER DUE TO DETACHED STUCCO FROM THE WALL AND LOOSE MORTAR JOINTS AT MULTIPLE LOCATIONS AT REAR ELEVATION NORTH. REMEDY: VACATE REAR COURTYARD

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01206220-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01206220-I1
BBL
3021000076
Review type
Standard Plan Examination
Existing stories
10
Proposed stories
10
Existing dwelling units
78
Proposed dwelling units
78
General construction