DOB filing M01103050-I1
Alteration filing at 219 East 42 Street
Building record · BIN 1037551
219 East 42 Street, Manhattan, NY 10017
A consolidated, filing-by-filing view of DOB records matched to this building identifier. The current snapshot links 3 independently sourced records, including 3 that are not recorded as completed, closed or withdrawn.
BUILDING RECORD · BIN 1037551
219 East 42 Street
Murray Hill-Kips Bay, Manhattan
A consolidated public-record view · updated Aug 28, 2026
A building-level summary of matched filings, active-status records and published identifiers.
The lot
The lot holds a 9-story elevator apartment building built in 1905, with 561 homes, on a 31,130 sq ft lot.
What it sold for
32 apartments on this tax block changed hands in the year the city last published, at a median of $15,000,000, from 11,347,216 to 62,217,784.
Recorded sale prices from the Department of Finance’s rolling file, covering the year to Aug 31, 2026. Transfers under $10,000 are left out: New York records deed transfers between relatives at a dollar, and those are not sales. No apartment number and no name is carried from either side.
Owner of record
675 THIRD OWNER LLC
As the assessment roll records it. Only owners that read as a company are shown here; where the roll names an individual, nothing is published.
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not any single filing. When the rest of New York went up
Violation record
The Department of Buildings has 5 open notices on record for this building, out of 78 notices on file; the most recent was issued Aug 3, 2026.
Issued Aug 3, 2026 — ADDITIONAL INFO-RESOLVE OPEN CEU OBJECTIONS.1)LEGALIZATION OF THE EXPIRED 3000PSI LW CONCRETE DESIGN PRODUCED BY BROOKLYN READY MIX 2) FORMAL REPLACEMENT OF THE SPECIAL INSPECTION AGENCY FOR CAST-IN-PLACE INSPECTIONS 3)FORMAL ID AND REPLACEMENT OF THE SPECIAL INPECTION REMEDY:COMPLY W/CODE.RESOLVE NO LATER THAN 9/30/26
Issued Jul 24, 2026 — PEER REVIEW-DEPT ORDERING STRUCTURAL PEER.REVIEW. ADDING NEW FLOORS 9-30 ABOVE EXISTING. REPRESENTS SIGNIFICANT ENLARGEMENT.REMEDY:PROVIDE NAMES OF 3 PES BY 7/31/26. SUBMIT PEER REVIEW REPORT BY 8/14/26
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
What is recorded here
New York City's Building Identification Number helps connect filings that may use different application numbers or describe different scopes of work. The records below are grouped because they publish BIN 1037551. They should not be read as a single construction project unless the underlying filings say so.
The matched set includes 3 alteration filing. Its latest status categories are 3 approved. Each filing page preserves its own status, dates, scope and source identifier.
Highest recorded values may come from different filings and must not be combined into one proposed project. Open the individual filings below for their exact scope. Values outside the publication's conservative data-quality bounds are withheld pending source review.
Address alerts
Get an email when NewYorkDaily detects a material change in the public DOB records associated with 219 East 42 Street.
Confirmation is required. Alerts describe source-data changes, not confirmed construction activity. Unsubscribe at any time. Privacy
Recorded history
Every dated event the city has published for this building, from all 3 matched filings, in the order it was recorded. A date marks what entered the public record, not what happened on site.
Installation of 8' high temporary construction plywood fence enclosure as per plans during construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of NYC building code of 2022. Filing M01111013-I1.
DOB lists a first permit date for M01111013-I1. That is not by itself confirmation of activity on site.
Installation of dual personnel/material hoist cars @ north courtyard (7,000 lb & 7,100 lb capacities) as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01103050-I1.
DOB lists a first permit date for M01103050-I1. That is not by itself confirmation of activity on site.
Installation of 7,100 lb dual personnel/material hoist cars @ south courtyard as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application. Filing M01088411-I1.
DOB lists a first permit date for M01088411-I1. That is not by itself confirmation of activity on site.
The latest status recorded for M01103050-I1 is “Permit Entire.”
The latest status recorded for M01111013-I1 is “Permit Entire.”
The latest status recorded for M01088411-I1 is “Permit Entire.”