What the filing says
A public-record reading of the proposed work.
Installation of 7,100 lb dual personnel/material hoist cars @ south courtyard as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story elevator apartment building built in 1905, with 561 homes, on a 31,130 sq ft lot.
- Built
- 1905
- Last altered
- 1963
- Floors
- 9
- Residential units
- 561
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C5-3
- Lot area
- 31,130 sq ft
- Building area
- 519,826 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 78 notices on file; the most recent was issued Aug 3, 2026.
- Construction
Issued Aug 3, 2026 — ADDITIONAL INFO-RESOLVE OPEN CEU OBJECTIONS.1)LEGALIZATION OF THE EXPIRED 3000PSI LW CONCRETE DESIGN PRODUCED BY BROOKLYN READY MIX 2) FORMAL REPLACEMENT OF THE SPECIAL INSPECTION AGENCY FOR CAST-IN-PLACE INSPECTIONS 3)FORMAL ID AND REPLACEMENT OF THE SPECIAL INPECTION REMEDY:COMPLY W/CODE.RESOLVE NO LATER THAN 9/30/26
- Construction
Issued Jul 24, 2026 — PEER REVIEW-DEPT ORDERING STRUCTURAL PEER.REVIEW. ADDING NEW FLOORS 9-30 ABOVE EXISTING. REPRESENTS SIGNIFICANT ENLARGEMENT.REMEDY:PROVIDE NAMES OF 3 PES BY 7/31/26. SUBMIT PEER REVIEW REPORT BY 8/14/26
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01088411-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01088411-I1
- BBL
- 1013160012
- Postal code
- 10017 · 484 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1