NYC DOB record · M01088411-I1

219 East 42 Street

219 East 42 Street, Manhattan, NY 10017

Alteration filing in Murray Hill-Kips Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01088411-I1

219 East 42 Street

Manhattan, NY 10017

Alteration filing · status dated Aug 28, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01088411-I1 as a alteration filing at 219 East 42 Street, Manhattan, NY 10017. Its latest published status category is Approved, dated Aug 28, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 28, 2026
Proposed scale
1 proposed dwelling unit
The building, not the filingwhat it sold for, the owner of record and every filing at BIN 1037551Applicant of recordSee the 5 filings that name Crimson Engineering
FiledSep 23, 2024
Current recordApproved
Proposed scale1 units
Recorded cost$20,400

What the filing says

A public-record reading of the proposed work.

Installation of 7,100 lb dual personnel/material hoist cars @ south courtyard as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story elevator apartment building built in 1905, with 561 homes, on a 31,130 sq ft lot.

Built
1905
Last altered
1963
Floors
9
Residential units
561
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
C5-3
Lot area
31,130 sq ft
Building area
519,826 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 78 notices on file; the most recent was issued Aug 3, 2026.

  • Construction

    Issued Aug 3, 2026 — ADDITIONAL INFO-RESOLVE OPEN CEU OBJECTIONS.1)LEGALIZATION OF THE EXPIRED 3000PSI LW CONCRETE DESIGN PRODUCED BY BROOKLYN READY MIX 2) FORMAL REPLACEMENT OF THE SPECIAL INSPECTION AGENCY FOR CAST-IN-PLACE INSPECTIONS 3)FORMAL ID AND REPLACEMENT OF THE SPECIAL INPECTION REMEDY:COMPLY W/CODE.RESOLVE NO LATER THAN 9/30/26

  • Construction

    Issued Jul 24, 2026 — PEER REVIEW-DEPT ORDERING STRUCTURAL PEER.REVIEW. ADDING NEW FLOORS 9-30 ABOVE EXISTING. REPRESENTS SIGNIFICANT ENLARGEMENT.REMEDY:PROVIDE NAMES OF 3 PES BY 7/31/26. SUBMIT PEER REVIEW REPORT BY 8/14/26

  • Failure to post energy

    Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01088411-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01088411-I1
BBL
1013160012
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1