What the filing says
A public-record reading of the proposed work.
Installation of 8' high temporary construction plywood fence enclosure as per plans during construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of NYC building code of 2022.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story elevator apartment building built in 1905, with 561 homes, on a 31,130 sq ft lot.
- Built
- 1905
- Last altered
- 1963
- Floors
- 9
- Residential units
- 561
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C5-3
- Lot area
- 31,130 sq ft
- Building area
- 519,826 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 78 notices on file; the most recent was issued Aug 3, 2026.
- Construction
Issued Aug 3, 2026 — ADDITIONAL INFO-RESOLVE OPEN CEU OBJECTIONS.1)LEGALIZATION OF THE EXPIRED 3000PSI LW CONCRETE DESIGN PRODUCED BY BROOKLYN READY MIX 2) FORMAL REPLACEMENT OF THE SPECIAL INSPECTION AGENCY FOR CAST-IN-PLACE INSPECTIONS 3)FORMAL ID AND REPLACEMENT OF THE SPECIAL INPECTION REMEDY:COMPLY W/CODE.RESOLVE NO LATER THAN 9/30/26
- Construction
Issued Jul 24, 2026 — PEER REVIEW-DEPT ORDERING STRUCTURAL PEER.REVIEW. ADDING NEW FLOORS 9-30 ABOVE EXISTING. REPRESENTS SIGNIFICANT ENLARGEMENT.REMEDY:PROVIDE NAMES OF 3 PES BY 7/31/26. SUBMIT PEER REVIEW REPORT BY 8/14/26
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01111013-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01111013-I1
- BBL
- 1013160012
- Postal code
- 10017 · 484 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








