NYC DOB record · M00844427-I1

100 Centre Street

100 Centre Street, Manhattan, NY 10013

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00844427-I1

100 Centre Street

Manhattan, NY 10013

Alteration filing · status dated Oct 19, 2026

Current record
Recorded as completed
Proposed scale
19 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00844427-I1 as a alteration filing at 100 Centre Street, Manhattan, NY 10013. Its latest published status category is Recorded as completed, dated Oct 19, 2026. The filing records 19 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Oct 19, 2026
Proposed scale
19 proposed stories
The building, not the filingopen housing violations and every filing at BIN 1079000Applicant of recordSee the 113 filings that name Superstructures ENG. + ARCH.
FiledMar 27, 2023
Current recordRecorded as completed
Proposed scale19 stories
Recorded cost$1.4M

What the filing says

A public-record reading of the proposed work.

Manhattan Criminal Court, Exterior facade repairs as per the plans filed including: Sill replacement. Crack/spalled/shifted stone repair & pinning. Granite cladding replacement. Masonry repointing. Metal door replacement.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 24-story other built in 1939, on a 173,338 sq ft lot.

Built
1939
Last altered
2023
Floors
24
Residential units
0
Building type
Other
Land use
Public facilities and institutions
Zoning district
C6-4
Lot area
173,338 sq ft
Building area
1,106,962 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 33 open notices on record for this building, out of 532 notices on file; the most recent was issued Sep 23, 2024.

  • High pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION

  • High pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION

  • 30 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00844427-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00844427-I1
BBL
1001670001
Review type
Professional Certification
Existing stories
19
Proposed stories
19
Existing dwelling units
0
Proposed dwelling units
0
General construction