NYC DOB record · M01252692-I1

120 East 75 Street

120 East 75 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01252692-I1

120 East 75 Street

Manhattan, NY 10021

Alteration filing · status dated Nov 5, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
33
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01252692-I1 as a alteration filing at 120 East 75 Street, Manhattan, NY 10021. Its latest published status category is Recorded as completed, dated Nov 5, 2026. The filing records 33 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 5, 2026
Proposed scale
33 proposed dwelling units
Applicant of recordSee the 51 filings that name Moore Engineering of NY, DPC
FiledSep 24, 2025
Current recordRecorded as completed
Proposed scale33 units
Recorded cost$21,500

What the filing says

A public-record reading of the proposed work.

Install washer machines and electric dryers for building tenant's accessory use at cellar. work includes plumbing piping, dryer venting, and installation of new sprinkler heads off existing standpipe. all as per plan. no change in egress use or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story elevator apartment building built in 1923, with 34 homes, on a 8,735 sq ft lot.

Built
1923
Last altered
1988
Floors
9
Residential units
34
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R8B
Lot area
8,735 sq ft
Building area
56,500 sq ft
Historic district
Upper East Side Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 7, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01252692-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 93,320 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01252692-I1
BIN
1043103
BBL
1014090061
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
33
Proposed dwelling units
33