NYC DOB record · M01436315-I1

14 East 75 Street

14 East 75 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01436315-I1

14 East 75 Street

Manhattan, NY 10021

Alteration filing · status dated Oct 15, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
51
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01436315-I1 as a alteration filing at 14 East 75 Street, Manhattan, NY 10021. Its latest published status category is Approved, dated Oct 15, 2026. The filing records 51 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 15, 2026
Proposed scale
51 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1041667Applicant of recordSee the 230 filings that name New Age Engineering PLLC
FiledOct 14, 2026
Current recordApproved
Proposed scale51 units
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Install new sprinkler heads for laundry room. convert existing stanpipe system to combined standpipe/sprinkler system as per plans. no change in use, occupancy, or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story elevator apartment building built in 1929, with 51 homes, on a 15,393 sq ft lot.

Built
1929
Last altered
2019
Floors
12
Residential units
51
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C5-1
Lot area
15,393 sq ft
Building area
141,160 sq ft
Historic district
Upper East Side Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 71 notices on file; the most recent was issued Sep 6, 2019.

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • (other bldgs types) - elevator affirmation of

    Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST

  • Plumbing

    Issued Aug 12, 2018 — THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING LAA #110259746 DUE TO SUSPENSION OF MASTER PLUMBERS LICENSE. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT AND OBTAIN A NEW MASTER PLUMBER TO SUPERSEDE THE PLUMBING PERMIT

  • 8 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01436315-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 82,285 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01436315-I1
BBL
1013890056
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
51
Proposed dwelling units
51