NYC DOB record · B00124255-I1

1600 East 19 Street

1600 East 19 Street, Brooklyn, NY 11230

Alteration filing in Midwood, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00124255-I1

1600 East 19 Street

Brooklyn, NY 11230

Alteration filing · status dated Dec 28, 2020

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00124255-I1 as a alteration filing at 1600 East 19 Street, Brooklyn, NY 11230. Its latest published status category is Recorded as completed, dated Dec 28, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 28, 2020
Proposed scale
Not stated in this filing
The building, not the filingwhat it sold for and every filing at BIN 3425902Applicant of recordSee the 651 filings that name Baileys Engineering PC
FiledJan 31, 2019
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of pipe scaffold as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story condominium built in 2019, with 22 homes, on a 8,000 sq ft lot.

Built
2019
Floors
8
Residential units
22
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
8,000 sq ft
Building area
24,008 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 29 notices on file; the most recent was issued Jun 30, 2026.

  • Construction

    Issued Jun 30, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER DOB VIOLATION #032525CLL31 401MK REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES B Y PE/RA AND SUBMIT A REPORT TO FACADES VIA EMAIL BY 4/24/25.AS OF 6/30 /26,NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADES UNIT.REMEDY:COM PLY WITH DOB VIOLATION #032525CLL31401MK IMMEDIATELY

  • Construction

    Issued Oct 29, 2025 — THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT# B01216938-I1 ON 10/28/25. REVOCATION OF APPROVAL(S) AND PERMIT(S)

  • Construction

    Issued Mar 25, 2025 — FTM BLDG EXTERIOR WALLS/APPURT.OBSERVED @ EXP2 W.ELEV EIFS/STUCCO WALL COLLASPSED/SPALLED. REMDY: OWNER TO RETAIN A NYS RDP TO VISUALLY INSP- ECT & EVALUATE 100% HANDS ON OF THE EIFS @ EXP2 W.ELEV TO DETERMINE S STABILITY.RDP SHALL CREATE REPORT OF RESULTS OF INSPECTION & CAUSES OF FAILURE & SUBMITTED REPORT TO FACADE@BUILDING.NYC.GOV

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00124255-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00124255-I1
BBL
3067657503
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source
Scaffolding