NYC DOB record · B00248228-I1

1600 East 19 Street

1600 East 19 Street, Brooklyn, NY 11230

Alteration filing in Midwood, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00248228-I1

1600 East 19 Street

Brooklyn, NY 11230

Alteration filing · status dated Sep 7, 2022

Current record
Approved
Proposed scale
Not stated
Dwelling units
22
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00248228-I1 as a alteration filing at 1600 East 19 Street, Brooklyn, NY 11230. Its latest published status category is Approved, dated Sep 7, 2022. The filing records 22 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 7, 2022
Proposed scale
22 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3425902Applicant of recordSee the 80 filings that name Shahrish Consulting LLC
FiledJan 10, 2020
Current recordApproved
Proposed scale22 units
Recorded cost$479,000

What the filing says

A public-record reading of the proposed work.

Mechanical work being filed in conjunction with New Building application number 321183349. No change to use, egress or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 8-story condominium built in 2019, with 22 homes, on a 8,000 sq ft lot.

Built
2019
Floors
8
Residential units
22
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
8,000 sq ft
Building area
24,008 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 29 notices on file; the most recent was issued Jun 30, 2026.

  • Construction

    Issued Jun 30, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER DOB VIOLATION #032525CLL31 401MK REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES B Y PE/RA AND SUBMIT A REPORT TO FACADES VIA EMAIL BY 4/24/25.AS OF 6/30 /26,NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADES UNIT.REMEDY:COM PLY WITH DOB VIOLATION #032525CLL31401MK IMMEDIATELY

  • Construction

    Issued Oct 29, 2025 — THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT# B01216938-I1 ON 10/28/25. REVOCATION OF APPROVAL(S) AND PERMIT(S)

  • Construction

    Issued Mar 25, 2025 — FTM BLDG EXTERIOR WALLS/APPURT.OBSERVED @ EXP2 W.ELEV EIFS/STUCCO WALL COLLASPSED/SPALLED. REMDY: OWNER TO RETAIN A NYS RDP TO VISUALLY INSP- ECT & EVALUATE 100% HANDS ON OF THE EIFS @ EXP2 W.ELEV TO DETERMINE S STABILITY.RDP SHALL CREATE REPORT OF RESULTS OF INSPECTION & CAUSES OF FAILURE & SUBMITTED REPORT TO FACADE@BUILDING.NYC.GOV

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00248228-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00248228-I1
BBL
3067657503
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
22
Proposed dwelling units
22
mechanical