What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1910, with 20 homes, on a 5,046 sq ft lot.
- Built
- 1910
- Last altered
- 1994
- Floors
- 5
- Residential units
- 20
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 5,046 sq ft
- Building area
- 18,160 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 20 notices on file; the most recent was issued May 29, 2026.
- Construction
Issued May 29, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#370477 VIO#042126PI11111SB DATED 04/21/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLANY BY 05/21/26. AS OF 05/29/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#370477 AND VIO#042126PI11111SB
- Construction
Issued Apr 21, 2026 — CORRECTION ACTION PLAN REQ'D-OBSVD CRACKED AND LEANING PARAPET WALL ON EXP1. CRACKS UNDER FIRE ESCAPE CONNECTIONS ON EXP1 ON 2FL AND 3FL MULT CRACKED STONE HEADERS & SILLS ON EXP1 BROKEN STONE HEADERS EXP1 ABOVE MAIN ENTRANCE.OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANIDN W/DOB&NYS TO EVAL ENTIRE BLDG&SUBMIT CORRECTIVE ACTION PLAN
- Construction
Issued Apr 21, 2026 — EMERGENCY WORK ORDER-IMMED HAZ CONDITIONS OBSV @ EXP1 SUCH AS CRACKED & LEANING PARAPET WALL CRACKS UNDER FIRE ESCAPE CONNECTION POINTS MULT CRACKS ON STONE HEADERS ABOVE ENTRANCE DOOR,BROKEN STONE HEADERS ON 2ND & 3RD FLOOR WINDOWS. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL S/W SHED FULL WIDTH OF EXP1 ON EAST 109TH ST
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01392321-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01392321-I1
- BIN
- 1052127
- BBL
- 1016360047
- Postal code
- 10029 · 263 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 25