What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1910, with 20 homes, on a 5,046 sq ft lot.
- Built
- 1910
- Last altered
- 1994
- Floors
- 5
- Residential units
- 20
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7A
- Lot area
- 5,046 sq ft
- Building area
- 18,160 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 9 notices on file; the most recent was issued May 29, 2026.
- Construction
Issued May 29, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#370476 VIO#042126PI11110SB DATED 04/21/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 05/21/26. AS OF 05/29/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/ COMMISSIONER'S ORDER CONTROL#370476 & VIO#042126PI1110SB
- Construction
Issued Apr 21, 2026 — CORRECTION ACTION PLAN REQ'D-OBSVD SEVERAL MASONRY CRACKS @ MULT LOCATIONS INCLUDING NEAR THE FIRE ESCAPE CONNECTION POINTS & CRACKS ON STONE HEADERS.ON ROOF OBSVD EXP1 PARAPET LEANING OUTWARD. OWNER TO IMMED RETAIN A REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN
- Construction
Issued Apr 21, 2026 — EMERGENCY WORK ORDER-IMMED HAZ CONDITIONS OBSVD @ EXP1 SUCH AS CRACKED & LEANING PARAPET WALL,CRACK ON STONE HEADERS ABOVE ENTRANCE DOOR AND BULGING ON MULT LOCATIONS OF EXP1. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL S/W SHED ON EXP1 ON EAST 109TH ST APPROX 25 LINEAR FT START WORK IMMED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01392323-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01392323-I1
- BIN
- 1052126
- BBL
- 1016360047
- Postal code
- 10029 · 263 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 20
- Proposed dwelling units
- 20