What the filing says
A public-record reading of the proposed work.
Heewith filing for modifications to the plumbing fixtures as per plans. no change to use occupanyc or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story condominium built in 1929, with 40 homes, on a 7,833 sq ft lot.
- Built
- 1929
- Floors
- 10
- Residential units
- 40
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R8B
- Lot area
- 7,833 sq ft
- Building area
- 49,891 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 43 notices on file; the most recent was issued Oct 5, 2012.
- Elevator
Issued Oct 5, 2012
- Elevator
Issued May 19, 2005
- Elevator
Issued Aug 9, 2000 — 1P17650
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01377105-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01377105-I1
- BBL
- 1015117502
- Postal code
- 10028 · 302 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 43
- Proposed dwelling units
- 43