What the filing says
A public-record reading of the proposed work.
Scope of work alteration type 2 herewith filing an application for the construction of a steel framed open balcony 16' x 26' at the rear yard to address the swo and vacate order no change to use egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1905, on a 3,000 sq ft lot.
- Built
- 1905
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R5
- Lot area
- 3,000 sq ft
- Building area
- 3,380 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Jun 22, 2025.
- Construction
Issued Jun 22, 2025 — AT TIME OF INSPECTION, OBSERVED STRUCTURAL (STEEL) DECKING WORK PERFORMED WITHOUT A PERMIT. BIS & DOB NOW SEARCH CONFIRMED NO PERMITS WERE ISSUED OR FILED FOR THE PREMISES. AN UNPERMITTED AND UNDOCUMENTED STRUCTURAL PATIO WAS ERECTED AT THE REAR OF THE PROPERTY.
- Construction
Issued Jun 22, 2025 — AT TIME OF INSPECTION, OBSERVED STRUCTURAL (STEEL) DECKING WORK PERFORMED WITHOUT A PERMIT. BIS & DOB NOW SEARCH CONFIRMED NO PERMITS WERE ISSUED OR FILED FOR THE PREMISES. AN UNPERMITTED AND UNDOCUMENTED STRUCTURAL PATIO WAS ERECTED AT THE REAR OF THE PROPERTY.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01475011-I1.
- Current status updated02
The latest recorded filing status is “Incomplete.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01475011-I1
- BBL
- 3055180050
- Postal code
- 11204 · 2048 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2