NYC DOB record · X01083400-I1

190 West 170 Street

190 West 170 Street, Bronx, NY 10452

Alteration filing in Highbridge, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01083400-I1

190 West 170 Street

Bronx, NY 10452

Alteration filing · status dated Oct 15, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
67
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01083400-I1 as a alteration filing at 190 West 170 Street, Bronx, NY 10452. Its latest published status category is Approved, dated Oct 15, 2026. The filing records 67 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 15, 2026
Proposed scale
67 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2003535Applicant of recordSee the 191 filings that name Msm Engineering Services, PLLC
FiledJul 22, 2024
Current recordApproved
Proposed scale67 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1929, with 67 homes, on a 14,469 sq ft lot.

Built
1929
Floors
6
Residential units
67
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
14,469 sq ft
Building area
72,646 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 32 notices on file; the most recent was issued Aug 26, 2024.

  • Construction

    Issued Aug 26, 2024 — FAILURE TO MAINTAIN FACADE & APPURTENANCES. 2 DECORATIVE BRICK CHIMNEY BULGING @ PARAPET LEVEL @ EXP1 N.ELEV. REMEDY:OWNER TO IMMEDIATELY RETAIN SERVICES OF NYS REG.DESIGN PROFESSIONAL WITH STRUCTURAL & FACACE EXPERIENCE TO EVALUATE 100% OF CHIMNEY ALSO CREATE REPORT OF RESULTS. FILE & PERMIT ALL WORK.REPORT TO FACADES@BUILDINGS.NYC.GOV

  • Construction

    Issued Jul 18, 2024 — EMERGENCY WORK ORDER, HAZARDOUS MATERIAL. AT EXP 1 LEANING PARAPET @ N EXP. LOOSE SPALLING MOTAR JOINTS THROUGHOUT EXP 1 PARAPET. STEP CRACK IN COURT YARD EXP 2 7 VERTICAL CRACKS DAMAGED/MISSING/SPALLING LOOSE MORTAR JOINTS.REMEDY:IMMEDIATE REMOVAL LOOSE HAZARD MATER. IMMEDIATELY PROV SIDEWALK SHED AND/OR SAFETY MEAS UNDER DIRECTION OF LICENSED PROF

  • Elevator

    Issued Dec 15, 2010

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 8, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01083400-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 82,285 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01083400-I1
BBL
2025320026
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
67
Proposed dwelling units
67
Sidewalk shed