What the filing says
A public-record reading of the proposed work.
Rebuilding the parapet wall on the north side (west wing) and repointing the brick as necessary as per plan. No change to use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1929, with 67 homes, on a 14,469 sq ft lot.
- Built
- 1929
- Floors
- 6
- Residential units
- 67
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 14,469 sq ft
- Building area
- 72,646 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 32 notices on file; the most recent was issued Aug 26, 2024.
- Construction
Issued Aug 26, 2024 — FAILURE TO MAINTAIN FACADE & APPURTENANCES. 2 DECORATIVE BRICK CHIMNEY BULGING @ PARAPET LEVEL @ EXP1 N.ELEV. REMEDY:OWNER TO IMMEDIATELY RETAIN SERVICES OF NYS REG.DESIGN PROFESSIONAL WITH STRUCTURAL & FACACE EXPERIENCE TO EVALUATE 100% OF CHIMNEY ALSO CREATE REPORT OF RESULTS. FILE & PERMIT ALL WORK.REPORT TO FACADES@BUILDINGS.NYC.GOV
- Construction
Issued Jul 18, 2024 — EMERGENCY WORK ORDER, HAZARDOUS MATERIAL. AT EXP 1 LEANING PARAPET @ N EXP. LOOSE SPALLING MOTAR JOINTS THROUGHOUT EXP 1 PARAPET. STEP CRACK IN COURT YARD EXP 2 7 VERTICAL CRACKS DAMAGED/MISSING/SPALLING LOOSE MORTAR JOINTS.REMEDY:IMMEDIATE REMOVAL LOOSE HAZARD MATER. IMMEDIATELY PROV SIDEWALK SHED AND/OR SAFETY MEAS UNDER DIRECTION OF LICENSED PROF
- Elevator
Issued Dec 15, 2010
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01135997-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 83,982 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01135997-I1
- BBL
- 2025320026
- Postal code
- 10452 · 286 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 67
- Proposed dwelling units
- 67