What the filing says
A public-record reading of the proposed work.
Limited facade repairs, including re-pointing mortar joints and replacement of damaged window sills. lintels, and damaged bricks.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1929, with 67 homes, on a 14,469 sq ft lot.
- Built
- 1929
- Floors
- 6
- Residential units
- 67
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 14,469 sq ft
- Building area
- 72,646 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 32 notices on file; the most recent was issued Aug 26, 2024.
- Construction
Issued Aug 26, 2024 — FAILURE TO MAINTAIN FACADE & APPURTENANCES. 2 DECORATIVE BRICK CHIMNEY BULGING @ PARAPET LEVEL @ EXP1 N.ELEV. REMEDY:OWNER TO IMMEDIATELY RETAIN SERVICES OF NYS REG.DESIGN PROFESSIONAL WITH STRUCTURAL & FACACE EXPERIENCE TO EVALUATE 100% OF CHIMNEY ALSO CREATE REPORT OF RESULTS. FILE & PERMIT ALL WORK.REPORT TO FACADES@BUILDINGS.NYC.GOV
- Construction
Issued Jul 18, 2024 — EMERGENCY WORK ORDER, HAZARDOUS MATERIAL. AT EXP 1 LEANING PARAPET @ N EXP. LOOSE SPALLING MOTAR JOINTS THROUGHOUT EXP 1 PARAPET. STEP CRACK IN COURT YARD EXP 2 7 VERTICAL CRACKS DAMAGED/MISSING/SPALLING LOOSE MORTAR JOINTS.REMEDY:IMMEDIATE REMOVAL LOOSE HAZARD MATER. IMMEDIATELY PROV SIDEWALK SHED AND/OR SAFETY MEAS UNDER DIRECTION OF LICENSED PROF
- Elevator
Issued Dec 15, 2010
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01291545-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01291545-I1
- BIN
- 2003535
- BBL
- 2025320026
- Postal code
- 10452 · 206 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 67
- Proposed dwelling units
- 67