What the filing says
A public-record reading of the proposed work.
Roof Replacement and Facade Restoration project. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 11-story condominium built in 1920, with 81 homes, on a 15,608 sq ft lot.
- Built
- 1920
- Floors
- 11
- Residential units
- 81
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C2-8
- Lot area
- 15,608 sq ft
- Building area
- 124,034 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 73 notices on file; the most recent was issued Mar 17, 2023.
- Construction
Issued Mar 17, 2023 — EMERGENCY WORK ORDER DUE TO;UNSAFE FIRE ESCAPE LANDINGS AT ALL FLOORS AT EXPOSURE#3NORTH WEST ELEVATION.OBSERVED SPALLING AT LANDING SLAB REMEDY:IMMEDIATELY MAKE AREAS SAFE.CORRECT UNDER DIRECTION OF REGISTER PROFESSIONAL ALL UNSAFE CONDITIONS.SUBMIT PHOTOS TO FACADES@BUILDINGS .NYC.GOV
- Hazardous condition (facade)
Issued Feb 21, 2023 — CYCLE 9B UNSAFE REPORT FILED
- Residential elevator periodic
Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00880961-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “On Hold - Pending Supersede of Progress Inspector.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00880961-I1
- BIN
- 1086107
- BBL
- 1012387503
- Postal code
- 10024 · 267 filings
- Review type
- Standard Plan Examination
- Existing stories
- 11
- Proposed stories
- 11
- Existing dwelling units
- 83
- Proposed dwelling units
- 83








