What the filing says
A public-record reading of the proposed work.
Alt type 2. upgrade bathroom & addition of new full bathroom and new washer and dryer.no change to use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 13-story elevator apartment building built in 1917, with 94 homes, on a 15,650 sq ft lot.
- Built
- 1917
- Last altered
- 1985
- Floors
- 13
- Residential units
- 94
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C4-6A
- Lot area
- 15,650 sq ft
- Building area
- 150,033 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 53 notices on file; the most recent was issued Jun 9, 2021.
- Construction
Issued Jun 9, 2021 — FAILURE TO COMPLY. ON 2/3/20, COMMISSIONER'S ORDER 322185 (020320CLL10702OS)WAS ISSUED TO THE OWNER TO IMMED RETAIN NYS LIC PROF TO CONDUCT 100% HANDS ON INSPECTION OF ALL CORNICES & PARAPET WALLS FACING PUBLIC RIGHT OF WAY TO EVAL SAFETY OF SAME. AS OF 6/9/21 OWNER HAS NOT COMLIED W/IMMED CURE ORDER. REMEDY:COMPLY W/CODE & COMM ORDER
- Failure to post energy
Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- No report and / or late filing (facade)
Issued May 31, 2018 — FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01251328-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 88,832 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01251328-I1
- BIN
- 1033584
- BBL
- 1012390023
- Postal code
- 10024 · 736 filings
- Review type
- Standard Plan Examination
- Existing stories
- 13
- Proposed stories
- 13
- Existing dwelling units
- 94
- Proposed dwelling units
- 94








