What the filing says
A public-record reading of the proposed work.
AT&T - Replacement of existing antennas, relocation of existing RRH units with installation of new RRH units and antenna kickbaks on the roof. All work in compliance with TPPN 5/98. No change to occupancy, use or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1952, with 264 homes, on a 120,000 sq ft lot.
- Built
- 1952
- Floors
- 6
- Residential units
- 264
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R4
- Lot area
- 120,000 sq ft
- Building area
- 261,072 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 10 notices on file; the most recent was issued Dec 11, 2025.
- Construction
Issued Dec 11, 2025 — AS PER SECTION 28-104.2.10 STOP ALL WORK UNDER APPLICATION #B00994297-I1 ON 10/22/25. DUE TO THE DEPARTMENT REVOCATION OF APPROVALS AND PERMITS. DEPARTMENT HAS REVOKED ALL APPROVALS AND PERMITS ASSOCIATED WITH B00994297-I1 AS PER 28-104.2.10 AND 28-105.10. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE.
- Fail to certify class
Issued Oct 27, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Local law 62/91 - boilers
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00343775-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00343775-I1
- BBL
- 3088190011
- Postal code
- 11229 · 1475 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 264
- Proposed dwelling units
- 264








