What the filing says
A public-record reading of the proposed work.
Apt 3f and 4f repairs due to fire, includes non-load bearing parition work, ceiliing repairs & new finishes as per plans. no st work & no chg to exst'g layouts. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1932, with 72 homes, on a 17,000 sq ft lot.
- Built
- 1932
- Floors
- 6
- Residential units
- 72
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 17,000 sq ft
- Building area
- 69,120 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 20 notices on file; the most recent was issued Dec 16, 2024.
- Construction
Issued Dec 16, 2024 — PARTIAL VACATE ORDER: OBSERVED STEP-CRACKING AND SEVERELY SPALLED/ SPALLING STUCCO AT MULTIPLE AREAS AT EXPOSURE #2 NORTH ELEV, EXPOSURE #3 EAST ELEV, AND EXPOSURE #4 SOUTH ELEVATION. REMEDY: VACATE COURTYARDS @ EXPOSURE #2 NORTH ELEV, EXPOSURE #3 EAST ELEVATION AND EXPOSURE 4 SOUTH ELEVATION. RESTRICT ACCESS
- Construction
Issued Nov 25, 2024 — EMERGENCY WORK ORDER DUE TO HAZARDOUS MATERIAL OBSERVED AT EXPOSURE #1 MULTIPLE SPALLING STONE OBSERVED AT PARAPET LEVEL, VERTICAL CRACKS LOCATED UNDER WINDOW SILLS. MULTIPLE STEP CRACKS AT PARAPET LEVEL REMEDY: IMMEDIATELY TAKE AND PROVIDE SAFETY MEASURES AT EXPOSURE #1 UNDER THE SUPERVISION OF A LICENSED PROFESSIONAL
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01184751-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 101,127 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01184751-I1
- BBL
- 2044260010
- Postal code
- 10467 · 411 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 72
- Proposed dwelling units
- 72