What the filing says
A public-record reading of the proposed work.
Local Law 11 Facade Renovation work, including guardrail post penetrations into the vapor barrier at the cooling tower roof. Application filed to resolve violation # 35559773R and # 35560019N. No proposed changes in occupancy, use or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 23-story office building built in 1921, on a 48,071 sq ft lot.
- Built
- 1921
- Last altered
- 2010
- Floors
- 23
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-5
- Lot area
- 48,071 sq ft
- Building area
- 809,401 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 304 notices on file; the most recent was issued Feb 16, 2024.
- Hazardous condition (facade)
Issued Feb 16, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Non-residential elevator periodic
Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
- Construction
Issued May 3, 2021 — EMERGENCY WORK ORDER. TAKE AND PROVIDE SAFETY MEASURES AND REPAIR DAMAGED FACADE TO PROTECT PUBLIC. REMEDY: INSTALL PUBLIC PROTECTION AT EXP 3 WEST ELEV. AND EXP 4 NORTH ELEV. REMOVE ANY LOOSE UNSAFE MATERIAL ON FACADE
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M08015662-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “On Hold - Pending Supersede of Applicant of Record.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M08015662-I1
- BBL
- 1000130027
- Postal code
- 10004 · 134 filings
- Review type
- Professional Certification
- Existing stories
- 22
- Proposed stories
- 22
- Existing dwelling units
- 0
- Proposed dwelling units
- 0