NYC DOB record · B01443644-I1

264 Bushwick Avenue

264 Bushwick Avenue, Brooklyn, NY 11206

Alteration filing in East Williamsburg, Brooklyn. The latest DOB status is plan examiner review.

A DOB plan examiner is reviewing the application. Nothing has been approved yet. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01443644-I1

264 Bushwick Avenue

Brooklyn, NY 11206

Alteration filing · status dated Sep 17, 2026

Current record
Under review
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01443644-I1 as a alteration filing at 264 Bushwick Avenue, Brooklyn, NY 11206. Its latest published status category is Under review, dated Sep 17, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 17, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3071247Applicant of recordSee the 83 filings that name Ap Professional Engineering PLLC
FiledAug 19, 2026
Current recordUnder review
Proposed scale3 stories
Recorded cost$163,800

What the filing says

A public-record reading of the proposed work.

Remove the existing stucco and install new stucco to address oath/ecbviolation no.: 39188620l.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story mainly residential with some commercial built in 1930, on a 1,875 sq ft lot.

Built
1930
Floors
3
Residential units
2
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
1,875 sq ft
Building area
4,075 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 14 open notices on record for this building, out of 17 notices on file; the most recent was issued Jun 5, 2026.

  • Construction

    Issued Jun 5, 2026 — EMERGENCY WORK ORDER.THE LOAD BEARNG MASONRY PIER@1STFL(S-E CRNR)THAT SUPPRTS 2ND,3RRD,&ROOF FLRS IS STRCTRLLY CMRPMSD&THERE IS POTENTIAL OF COLLAPSE.UNDR DRCT&CONTINUUS SPRVSN OF PE IMMED INSTLL TEMP SHORNG& BRACE AS REQ'D.PE TO SBMT MEANS&METHDS FOR REVIEW PRIOR TO

  • Construction

    Issued May 14, 2026 — REQUEST STRUCTURE STABILITY REPORT FOR FA ADE WALLS AT EXPOSURES 1 AND 2. OBSERVED VERTICAL AND HORIZONTAL CRACKS, DAMAGED BRICKWORK, ERODED MORTAR JOINTS, AND BULGING FA ADE SECTIONS AT MULTIPLE LOCATIONS THROUGHOUT THE EXTERIOR WALL, CREATING A POTENTIALLY UNSAFE CONDITION.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • 11 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01443644-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Plan Examiner Review.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01443644-I1
BBL
3030630019
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
2
Proposed dwelling units
2
General construction