What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 1920, with 75 homes, on a 41,196 sq ft lot.
- Built
- 1920
- Last altered
- 2017
- Floors
- 7
- Residential units
- 75
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-2
- Lot area
- 41,196 sq ft
- Building area
- 184,411 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 38 notices on file; the most recent was issued Jun 26, 2025.
- Construction
Issued Jun 26, 2025 — PARTIAL VACATE ORDER-ENTIRE PARKING GARAGE @ CELLAR LEVEL:THE PARKING GARAGE EXHIBITS SUBSTANIAL DELETERIOUS MATERIAL, INCLUDING MULT LARGE SECTIONS OF REINFORCED CONCRETE SLABS W/SIGNIFICANT SECTIONS OF SPALLED CONCRETE. VACATE ENTIRE PARKING GARAGE AT CELLAR LEVEL
- Construction
Issued Jun 23, 2025 — EMERGENCY WORK.AS NOTED AT TIME OF INSPECTION ON AN OCCUPIED PARKING STRUCTURE OBSRVD@VARIOUS LOCATIONS CRCKD CONCRETE BEAMS & COLUMNS RUSTNG METAL DECK,EXPOSD REINFORCMNT&MISSNG FIREPROOFNG MATERIAL.OWNR TO TRAIN A NYS REG DSGN PROFSSNL TO DRCT&SPRVSE THE IMMED INSTALLATION OF SFTY MEASURES&PRVDE SHORNG TO FAILD STRCTRL ELEMENTS
- Plumbing
Issued Jun 13, 2025 — UNABLE TO VERIFY WORK DONE UNDER LAA #B01231100 DUE TO NO ACCESS AND UNRESPONSIVE AUDIT OBJECTIONS. 0% WORK DONE
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00639262-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00639262-I1
- BBL
- 3018740001
- Postal code
- 11205 · 2281 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 75
- Proposed dwelling units
- 75