NYC DOB record · B00028408-I1

295 Washington Avenue

295 Washington Avenue, Brooklyn, NY 11205

Alteration filing in Clinton Hill, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00028408-I1

295 Washington Avenue

Brooklyn, NY 11205

Alteration filing · status dated Dec 28, 2020

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00028408-I1 as a alteration filing at 295 Washington Avenue, Brooklyn, NY 11205. Its latest published status category is Recorded as completed, dated Dec 28, 2020. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 28, 2020
Proposed scale
Not stated in this filing
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3055086Applicant of recordSee the 95 filings that name Scherer Design Group
FiledApr 16, 2019
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

AT&T - Replacement of existing RRH units on roof. Relocation of existing antenna sectors on roof and facade. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1925, with 72 homes, on a 14,600 sq ft lot.

Built
1925
Floors
6
Residential units
72
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6B
Lot area
14,600 sq ft
Building area
57,366 sq ft
Historic district
Clinton Hill Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 27 notices on file; the most recent was issued Aug 18, 2021.

  • Elevator

    Issued Aug 18, 2021

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • Elevator annual inspection /

    Issued Dec 1, 2016 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2015 INSPECTION/TEST

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00028408-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04
  5. Current status updated

    The latest recorded filing status is “LOC Issued.”

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00028408-I1
BBL
3019180006
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source
antenna