What the filing says
A public-record reading of the proposed work.
Replacement of existing HVAC system with installation of new louvers and DAC in exisitng equipment shelter on grade. No change to occupancy, use, or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story place of worship built in 1993, on a 48,636 sq ft lot.
- Built
- 1993
- Last altered
- 2017
- Floors
- 3
- Residential units
- 0
- Building type
- Place of worship
- Land use
- Public facilities and institutions
- Zoning district
- R3A
- Lot area
- 48,636 sq ft
- Building area
- 60,947 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 44 notices on file; the most recent was issued Dec 17, 2019.
- Construction
Issued Dec 17, 2019 — THE DOB NOTIFIED YOU OR ITS INTENT TO REVOKE THE APPROVAL PERMIT# 520290694 ON DEC 06, 2019. AS OF 12/17/2019 HAS NOT RECEIVED SUFFICIENT INFORMATION TO DEMONSTRATE THAT THE APPROVAL & PERMIT SHOULD NOT BE REVOKED. THERE FOR PURSUANT TO SECTION 28-104.02.10&29-105.10 OF THE ADMN CODE OF NYC. THE APPROVAL PERMIT
- Local law 10/81 -
Issued Jan 13, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S00313901-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S00313901-I1
- BBL
- 5001090006
- Postal code
- 10301 · 93 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0