NYC DOB record · B00611202-P4

340 Nevins Street

340 Nevins Street, Brooklyn, NY 11215

New building filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00611202-P4

340 Nevins Street

Brooklyn, NY 11215

New building · status dated Jan 15, 2025

Current record
Approved
Proposed scale
22 stories
Dwelling units
320
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00611202-P4 as a new building at 340 Nevins Street, Brooklyn, NY 11215. Its latest published status category is Approved, dated Jan 15, 2025. The filing records 22 proposed stories and 320 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Jan 15, 2025
Proposed scale
22 proposed stories and 320 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3430358Applicant of recordSee the 31 filings that name Fogarty Finger LLC
FiledOct 22, 2024
Current recordApproved
Proposed scale22 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Filing to erect a new 22 story mixed use building (building B). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St). This NB is located within the Gowanus rezoning area & is pursuing FO approval/permit . Related NB B00611166-I1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 17-story elevator apartment building built in 2024, with 654 homes, on a 51,445 sq ft lot.

Built
2024
Last altered
2024
Floors
17
Residential units
654
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
M1-4/R7-2
Lot area
51,445 sq ft
Building area
286,703 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00611202-P4.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00611202-P4
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
22
Existing dwelling units
Empty in the source
Proposed dwelling units
320
General construction