What the filing says
A public-record reading of the proposed work.
Installation of system scaffold stair tower as per drawings. system scaffold stair tower shall comply with chapter #33 of the NYC building code. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 11-story health facility built in 1971, on a 10,042 sq ft lot.
- Built
- 1971
- Last altered
- 1987
- Floors
- 11
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R8
- Lot area
- 10,042 sq ft
- Building area
- 172,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 38 open notices on record for this building, out of 90 notices on file; the most recent was issued Feb 6, 2026.
- Construction
Issued Feb 6, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECTED FACADE CONDITIONS. MULTIPLE SPALLED MASONRY, EXPOSE REBAR AND H. BEAMS AT MANY LOCATIONS OF EXPOSURE 1. REMEDY: REPAIR AND/OR REPLACE
- Failure to post energy
Issued Dec 1, 2024 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
- Construction
Issued Sep 12, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AS NOTED: AT TIME OF INSPECTION, OBSERVED ON EXPOSURE #1 NORTH ELEVATION: 99% OF FACADE HAS BEEN REMOVED;SPALLED FLOOR SLABS ON MULTIPLE FLOORS DAMAGED UNFINISHED BRICK WALL @ PERAPE E 9TH FL. EXPOSURE #2 EAST ELEV SPALLING BRICKS @PARAPET E 9FL. REMEDY: REPAIR AND/OR REPLACE FACADE
35 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00055132-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00055132-I1
- BBL
- 1010670044
- Postal code
- 10019 · 552 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








