What the filing says
A public-record reading of the proposed work.
ERECT ACCESSORY BUSINESS WALL SIGN FOR LOS TACOS No. 1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Violation record
Are there open violations here?
The Department of Buildings has 43 open notices on record for this building, out of 180 notices on file; the most recent was issued Sep 4, 2024.
- Construction
Issued Sep 4, 2024 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #320914338 DUE TO SITE SAFETY MANAGER WITHDRAWAL
- Construction
Issued May 20, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBERVED AT EXPOSURE 4 BROKEN/MISSING WINDOW PANE AT LOWER ELEVATION SET BACK REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jul 14, 2021 — FTM BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES. AT THE TIME OF INSPECTION OBSERVED AT EXP 1 SOUTH ELEVATION CRACKED STONE IN PARAPET WALL, BROKEN/SPALLED STONE IN CORNICE. DETERIORATING MORTAR JOINTS IN EXP 4. REMEDY: MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES
40 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01460356-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01460356-I1
- BBL
- 3001490100
- Postal code
- 11201 · 6128 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 547
- Proposed dwelling units
- 547