What the filing says
A public-record reading of the proposed work.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Violation record
Are there open violations here?
The Department of Buildings has 43 open notices on record for this building, out of 180 notices on file; the most recent was issued Sep 4, 2024.
- Construction
Issued Sep 4, 2024 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION #320914338 DUE TO SITE SAFETY MANAGER WITHDRAWAL
- Construction
Issued May 20, 2024 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBERVED AT EXPOSURE 4 BROKEN/MISSING WINDOW PANE AT LOWER ELEVATION SET BACK REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Jul 14, 2021 — FTM BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES. AT THE TIME OF INSPECTION OBSERVED AT EXP 1 SOUTH ELEVATION CRACKED STONE IN PARAPET WALL, BROKEN/SPALLED STONE IN CORNICE. DETERIORATING MORTAR JOINTS IN EXP 4. REMEDY: MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES
40 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01296382-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01296382-I1
- BBL
- 3001490100
- Postal code
- 11201 · 5974 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0