NYC DOB record · B01226832-P2

9 Dekalb Avenue

9 Dekalb Avenue, Brooklyn, NY 11201

Alteration filing in Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn. The latest DOB status is chief plan examiner/ assistant chief plan examiner review.

A senior plan examiner is reviewing the application.

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 5, 2026 · Verify the source row

Open full map
9 Dekalb Avenue record graphic showing the DOB filing status and stated proposal scale
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01226832-P2 as a alteration filing at 9 Dekalb Avenue, Brooklyn, NY 11201. Its latest published status category is Under review, dated Sep 3, 2026. The filing records 541 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 3, 2026
Proposed scale
541 proposed dwelling units
Complete building dossierView all 10 filings associated with BIN 3000370Applicant of recordSee the 34 filings that name Jaros Baum & Bolles
FiledAug 4, 2026
Current recordUnder review
Proposed scale541 units
Recorded cost$959,775

What the filing says

A public-record reading of the proposed work.

The work filing here within consist if the removal of existing based buildings sprinklers heads and associated branch piping and the installation of new sprinklers heads for new tenant fit out work.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 58 open notices on record for this building, out of 180 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • 55 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 5, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01226832-P2.

    01
  2. Current status updated

    The latest recorded filing status is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”

    02

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01226832-P2
BBL
3001490100
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
541
Proposed dwelling units
541