What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1928, with 61 homes, on a 12,367 sq ft lot.
- Built
- 1928
- Last altered
- 1990
- Floors
- 6
- Residential units
- 61
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 12,367 sq ft
- Building area
- 53,400 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 45 notices on file; the most recent was issued Sep 10, 2026.
- Immediate
Issued Sep 10, 2026 — REMEDY: IMMEDIATELY INSTALL 580" FT OF SIDEWALK SHED. BRYANT AVENUE, 20 FT AT THE NORTH COURTYARD, 200 FT AT THE EAST REAR COURT YARD 140 FT AT THE SOUTH COURT YARD. TO PROTECT AND SECURE PUBLIC SAFETY, AS PER 1 RCNY 103.4
- Construction
Issued Sep 2, 2026 — EWO DUE TO MULTIPLE DEFECTIVE FACADE CONDITIONS THAT POSE IMMEDIATE HAZARD TO PUBLIC SAFETY.CRACKED,BULGING BRICK @ STACKED BOND BY 6FL COURTYARD SETBACK @ EXP#1W.CRACKED DECORATIVE STONE MASONRY EXP2N,3E,4 S.REMEDY: IMMEDIATELY TAKE/PROVIDE ADEQUATE SAFETY MEASURE TO SECURE/ PROTECT PUBLIC U/FULL SUPERVISION OF NYS LICENSED PROFESSIONAL
- Construction
Issued Sep 2, 2026 — FTM BLDG EXTERIOR FACADE & APPURTANCES DUE TO MULT DEFECT FACADE CONDS POSING IMMED HAZARD TO PUB SAFETY. 1.CRACKED/DEFECTIVE BRICK MULT LOCS W/BULGING BRICK EXP1W COURTYARD SETBACK 2.CRACKED SPALLING STUCCO E2N, 3E,4S. REMEDY:OWNER TO IMMED RETAIN NYS LIC PROF W/QEWI CERT TO INSP/ EVAL FACADE CONDS:REPORT TO FACADES@BUILDINGS.NYC.GOV BY 9/2/2026
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01464177-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01464177-I1
- BIN
- 2006567
- BBL
- 2027630329
- Postal code
- 10474 · 57 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 61
- Proposed dwelling units
- 61








