What the filing says
A public-record reading of the proposed work.
Installation of a heavy duty sidewalk shed as per plans in conjunction with general construction. no change in use, egress or occupancy. sidewalk shed shall comply with 2014 NYC building code, chapter 33.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story office building built in 1920, on a 2,000 sq ft lot.
- Built
- 1920
- Last altered
- 2016
- Floors
- 6
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- R6
- Lot area
- 2,000 sq ft
- Building area
- 8,237 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 17 notices on file; the most recent was issued Oct 19, 2022.
- Construction
Issued Oct 19, 2022 — FTM BLDG IN A CODE COMPLIANT MANNER. CONDITIONS HAS NOT CHANGED SINCE THE LAST VIOLATION #040422LL31201JC WAS ISSUED. BLDG IS A STALLED CONSTRUCTION SITE AND NO WORK IS ONGOING. MASONRY WORK IS INCOMPLETE WITH ACTIVE PERMITS. NOT SIGN OF WORKERS. REMEDY: COMPLY WITH CODE
- Construction
Issued Apr 4, 2022 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNERBUILDING IS A STALLED CONSTRUCTION SITE AND HAS NO ON GOING WORKMASONRY WORK I WORK HAS BEEN STALLED WITH ACTIVE PERMITS COMPLY WITH CODE
- Construction
Issued Jul 15, 2021
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00301568-P3.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00301568-P3
- BBL
- 3056860016
- Postal code
- 11220 · 2080 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








