NYC DOB record · B00572332-I1

902 Bedford Avenue

902 Bedford Avenue, Brooklyn, NY 11205

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00572332-I1

902 Bedford Avenue

Brooklyn, NY 11205

Alteration filing · status dated Jan 26, 2024

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
36
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00572332-I1 as a alteration filing at 902 Bedford Avenue, Brooklyn, NY 11205. Its latest published status category is Recorded as completed, dated Jan 26, 2024. The filing records 36 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jan 26, 2024
Proposed scale
36 proposed dwelling units
The building, not the filingapartment sizes, the owner of record and every filing at BIN 3055000Applicant of recordSee the 417 filings that name Kmb Design Group, LLC
FiledMar 22, 2022
Current recordRecorded as completed
Proposed scale36 units
Recorded cost$67,800

What the filing says

A public-record reading of the proposed work.

Modifications to existing verizon site to include new steel platform with (3) equipment cabinet installs, replacement of (9) antennas, and (6) rrh units, and removal of (1) equipment cabinet. all in conformance with tppn #5/98.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00572332-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00572332-I1
BBL
3019140035
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
36
Proposed dwelling units
36
antenna